1972-75 P.T. TAMBANG TIMAH, Indonesia
A complete redesign and reconstruction of their previous tin smelter to increase production from 5,000 tons to 33,000 tons per year of refined tin.

1977-80 EMPRESA NACIONAL DE FUNDICIONES, Bolivia
Turnkey supply of Tin Refining Plant for refining 10,000 TPY tin by vacuum distillation to 99.85% high-grade quality.

1980-82 BERGSØE METALS LTD., Thailand
Design and project management. 8,000 TPY secondary lead smelter producing hard and soft lead.

1981-83 SOMIRWA, Rwanda, Africa
Tin Smelting and Refining Plant for tin concentrates to high-grade quality tin with a capacity of 3,000 TPY.

1982-83 ELECTRICAL INDUSTRIES LTD., Trinidad
Design, equipment supply and project management of an 8,000 TPY secondary lead smelter, producing hard and soft lead at a total project cost of 5 mill. USD.

1985 METALLOCHIMIQUE B.V., Belgium
Vacuum distillation furnace for the refining of 10,000 TPY tin-lead alloys.

1985-86 BARBOSA & FILHAS LTDA, Portugal
Design and supply of plant equipment and pollution control equipment to establish production of 1,000 TPY copper alloys.

1987-88 BOLIDEN METAL WORKS A/S, Denmark
Design and project management of upgrading a secondary aluminium smelter from 6,000 to 15,000 TPY.

1987-90 INDIAN LEAD LTD, India
Design of production and pollution control equipment and supply of process technology for upgrading primary and secondary lead smelter from 8,000 to 20,000 TPY.

1988-89 BLEIBERGER BERGWERKS UNION, Austria
Design and equipment supply for an 8000 TPY rotary furnace lead smelter.

1989 HOLLANDSE METALLURGISCHE INDUSTRIE BILLITON B.V., The Netherlands
Study of the application of vacuum distillation furnaces to a 50,000 TPY tin and lead smelter.

1989-91 L'ACCUMULATEUR TUNISIEN ASSAD S.A., Tunisia
Process technology and pollution control equipment supply for 3,500 TPY rotary furnace lead smelter.

1989-91 METPLAST S.A., Greece
Design, process technology and equipment supply for upgrading rotary furnace lead smelter from 2,000 to 8,000 TPY.

1990-91 ELKRAFT A.M.B.A, Denmark
Turnkey supply of central vacuum cleaning plant for new coal fired power plant.

1990-91 NIRO A/S, Denmark
Turnkey supply of gas cleaning and pollution control equipment for lime and ferro sulphate plant.

1991 Bergsøe METALS LTD, Thailand
Supply of short rotary furnace and pollution control equipment for production of 6,000 TPY secondary lead.

1991-92 EPTAL A/S, Denmark
Turnkey supply of complete gas treatment and pollution equipment for 20,000 TPY secondary aluminium smelter.

1992-94 FALCON METALS LTD, Dubai
Total plant design and process technology for a 10,000 TPY secondary tin-lead smelter.

1994-95 P.T. KOBA TIN, Indonesia
Total plant design and process technology for a 13,000 TPY primary tin smelter.

1994-96 MINSUR S.A., Peru.
Supply of refinery equipment and process instructions for a 20,000 TPY primary tin refinery.

1995 P.T. KOBA TIN, Indonesia.
Supply of baghouse filters for 13,500 TPY primary tin smelter and pumps and stirrers for tin refinery.

1997 RENISON LIMITED, Australia.
Technology and feasibility study for establishment of 10,000 tpy primary tin smelter in various optional locations.

1997 PENDEN CEMENT FACTORY, Bhutan (Ministry of Foreign Affairs, Denmark)
Turnkey supply of central vacuum cleaning plant for cement factory.

1997 FUNDICION DE METALES BERA DEL PERU S.A, Peru.
Rotary furnace productivity upgrade including design, process and equipment supply.

1997-98 DANISH CEMENT CONSULT LTD, Denmark.
Environmental Consulting for 10,000 tpy copper and brass product manufacturing plant in Bulgaria.

1997- MINSUR S.A., Peru.
Supply of equipment and process instructions for treatment of copper, arsenic and bismuth by-products from primary 20,000 tpy tin refinery.

1998-99 METAL RECLAMATION INDUSTRIES, Malaysia.
Design of 30,000 tpy secondary lead refinery.

1999-01 DANISH ENVIRONMENTAL PROTECTION AGENCY /KOZM S.A.,Bulgaria.
Design, procurement and construction management for environmental upgrade program to a 50,000 tpy copper and brass product manufacturing facility.

2000-01 MINOR METALS AND MINERALS LTD, Nigeria.
Technology and feasibility study for establishment of 5,000 tpy secondary copper smelter.

2001-02 TRITON CORP LTD, India.
Total plant design and process technology for a 10,000 tpy primary tin smelter.

2002-03 National Lead Smelting Co. Ltd. - Riyadh, Kingdom of Saudi Arabia.
Total plant design and equipment supply for Furnace line 2 designed for smelting 62 tonnes lead bearing material per day

 
 